What is the difference between a Level 1, 2 and 3 reserve study?

The short answer

The levels come from the Community Associations Institute's National Reserve Study Standards. A Level I full study builds the component inventory from scratch with a site visit. A Level II update keeps the inventory but sends the specialist back on site to reassess condition. A Level III update is prepared from the previous report and the association's records without a visit, and costs the least.

On this page
  1. Level I: full reserve study
  2. Level II: update with a site visit
  3. Level III: update without a site visit
  4. A fourth case: before the community exists
  5. Which level, when
  6. What to ask when the proposals arrive

Three proposals land in a board’s inbox for “a reserve study” and the fees are $2,400, $4,100 and $6,800. Before anyone asks why the cheapest firm is so cheap, check which level each one is quoting. The levels are defined in the National Reserve Study Standards published by the Community Associations Institute, and most of the difference in fee is the difference in level.

Level I: full reserve study

A Level I study starts from nothing. The specialist visits the property, builds the component inventory by measuring and counting, assesses the condition of each item on site, estimates useful and remaining lives and replacement costs, and then prepares the fund status and the funding plan. It is the most thorough and the most expensive level, and it is the one to order when the association has never had a study, when the last one is old or was prepared by someone whose work the board does not trust, or after major construction that changed the inventory.

Expect the specialist to spend the better part of a day on site for a mid-sized community and longer for several buildings, and expect the report to be the longest of the three.

Level II: update with a site visit

A Level II update assumes the inventory from the last study is sound. The specialist returns to the property, looks at the components again, adjusts conditions and remaining lives, updates replacement costs to current prices, and reworks the financial analysis. Quantities are checked rather than re-measured. It catches the things that changed since the last report, such as a roof that aged faster than expected or paving that was replaced early, without repeating the work of building the inventory.

This is the level most associations should be ordering every few years between full studies. Several states that require periodic studies write a site visit into the cycle: Washington’s statute, for example, calls for an update with a visual site inspection at least every third year.

Level III: update without a site visit

A Level III update is prepared from the desk. The specialist takes the previous report, applies a year of aging to every component, updates costs for inflation and any invoices the association sends in, brings the fund balance up to date and recalculates the funding plan. Nobody visits. It is the cheapest level and the right one for the years in between site visits, when the board wants a current percent funded and a current recommended contribution without paying for a day on site.

Its weakness is obvious: it cannot see anything. If the inventory was wrong or a component has failed early, a Level III update carries the error forward and the funding plan is wrong with it.

A fourth case: before the community exists

The standards also describe a preliminary study for a community that is still being built, prepared from plans and specifications rather than from a site visit. Developers commission these to set the first budget. Boards taking over from a developer should treat a preliminary study as a starting point and order a Level I study once the community is finished and occupied.

Which level, when

A workable cycle for an association with no statutory schedule looks like this:

Year Level Why
1 Level I full study Build the inventory properly
2 Level III update Keep the numbers current at low cost
3 Level II update with site visit Reassess condition on site
4 Level III update Desk update
5 Level II update with site visit Reassess again
6 to 10 Repeat, with a new Level I study at year 10 or after major work Reset the inventory

Where a state statute sets an interval, it wins. Where the governing documents set one, they win too.

What to ask when the proposals arrive

Ask each firm which level it has quoted and why. Ask whether the fee for a Level I study includes a draft for board comment and a presentation at a meeting. Ask what a Level II and a Level III update will cost in the following years, so that the five-year cost is being compared, not one invoice. And if the cheapest proposal is a Level III update on a study that is six years old, that is the reason it is cheap.

Where our information comes from

Request proposals for your reserve study

The community ZIP code, how to reach you, then a few taps about the association. About a minute, and nothing is sent to a firm until you say so.

This is a free introduction service, not a reserve study provider. We find one firm that works in your state and tell you its name before anything is shared. Nobody contacts you until you say yes.

Step 1 of 3

Where is the community?
Get a quote