Structural integrity reserve study
A structural integrity reserve study, SIRS for short, is the reserve study Florida requires for condominium and cooperative buildings of three or more habitable stories. It covers the structural and life-safety components the statute names, its inspection has to be performed or verified by a licensed or certified professional, and the reserves it identifies cannot be waived. It sits alongside the ordinary reserve study, not in place of it.
What the study must cover
The statute lists the components a SIRS has to address: the roof; the structure, including load-bearing walls and other primary structural members and systems; fireproofing and fire protection systems; plumbing; electrical systems; waterproofing and exterior painting; windows and exterior doors; and any other item whose deferred maintenance or replacement would cost more than the statutory threshold and whose failure would affect one of the items above.
For each one the study has to state the remaining useful life and the estimated replacement or deferred-maintenance cost, and recommend a reserve amount. Unlike the ordinary reserve study, the SIRS components are funded on a mandatory basis once the study is adopted.
Who may perform it
Visual inspection performed or verified by a Florida-licensed engineer or architect, or a CAI Reserve Specialist or APRA Professional Reserve Analyst. The inspection is the part that sets the SIRS apart from an ordinary study, so a proposal should name the licensed or certified person who will walk the building and the person who signs the report.
Recent changes
HB 913 (ch. 2025-175) set the SIRS threshold at three habitable stories, raised the non-specified component threshold from $10,000 to $25,000 with CPI indexing, barred SIRS preparers from doing the repairs, and added line-of-credit and pooled-reserve options. 2026 session: SB 722 (Condominium Structural Integrity Reserve Studies) died in committee on March 13, 2026.
Existing unit-owner controlled associations had to complete a SIRS by December 31, 2025; where combined with a milestone inspection, no later than December 31, 2026. Owner-controlled associations may not waive or reduce SIRS reserves for budgets adopted on or after December 31, 2024. The 2026 statute history cites ch. 2026-14 (content not confirmed). A page-one ranking check for 'reserve study florida' was not run.
General information read from the statute, not legal advice; the association's attorney should confirm how the current text applies to your building.
habitable stories brings a building under the SIRS rule.
is the longest a building may go between structural integrity reserve studies.
is the typical fee, November 2026. A guide, not a quote.
listed firms state that they produce structural integrity reserve studies. See the Florida page.
A Florida building of three or more stories? Ask for proposals from firms that produce structural integrity reserve studies.
Get a quoteQuestions about the SIRS
Which buildings need a structural integrity reserve study?
How often is a SIRS required?
Who can perform a SIRS?
Can the association waive the reserves a SIRS identifies?
Is a SIRS the same as a milestone inspection?
What does a SIRS cost?
Where this information comes from
Related pages
- Reserve study companies in FloridaFirms, the statute and costs.
- Reserve study costSIRS against the ordinary study.
- Comparing proposalsWhat to read before the fee.
Request proposals for a structural integrity reserve study
The community ZIP code, how to reach you, then a few taps about the association. About a minute, and nothing is sent to a firm until you say so.
This is a free introduction service, not a reserve study provider. We find one firm that works in your state and tell you its name before anything is shared. Nobody contacts you until you say yes.
Thank you. Your request is logged.
- We look for a reserve study firm that covers your state and does the kind of study you described, then email or call to tell you which firm it is.
- Your details reach that firm only if you say yes.
- The firm sends a written proposal with the scope, the level of service and the fee. No marketing from us, ever.